Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
crane-price-in-france
Crane Price France 2025 | Liebherr Tadano XCMG Cost Guide
Compare 2025 crane prices in France. Liebherr LTM 1070, Tadano ATF 100 & XCMG QY70 costs, leasing rates & Stage V CE options for contractors.
crane price in france
liebherr ltm france, tadano atf france, xcmg qy70 france, used crane france, mobile crane france, tower crane france, stage v crane france, ce certified crane france, construction machinery france 2025, heavy equipment france
Franceβs booming infrastructure and industrial projects in 2025 are fueling demand for Stage V CE-certified mobile and all-terrain cranes.
Buyers in Paris, Lyon, Marseille, and Toulouse are prioritizing fuel-efficient machines with smart load management and low operating costs.
This guide from BuyHeavyMachines.com compares Liebherr LTM 1070, Tadano ATF 100, and XCMG QY70, covering 2025 pricing, finance rates, and real operating costs in France.
Type | Capacity (t) | Boom Length (m) | Average Price (β¬) | Example Models |
---|---|---|---|---|
Mobile Crane | 50 β 70 | 40 β 55 | 165 000 β 245 000 | Liebherr LTM 1070 β’ Tadano ATF 70 β’ XCMG QY70 |
All-Terrain Crane | 80 β 130 | 50 β 70 | 245 000 β 325 000 | Tadano ATF 100 β’ Liebherr LTM 1090 β’ XCMG QY100 |
Tower Crane | 6 β 16 | 40 β 65 | 85 000 β 155 000 | Potain MDT 219 β’ Liebherr 132 EC-H |
Used 2017β2023 CE-approved cranes cost β 35 % less on average.
Model | Capacity (t) | Boom (m) | Price (β¬) | Highlights |
---|---|---|---|---|
LTM 1050-3.1 | 50 | 40 | 165 000 β 205 000 | VarioBase β’ Stage V Diesel β’ ECOmode |
LTM 1070-4.2 | 70 | 50 | 195 000 β 245 000 | ECOdrive β’ Boom 50 m β’ Smart Chart |
LTM 1090-4.1 | 90 | 60 | 245 000 β 295 000 | Fuel Saver β’ Auto Leveling |
Why Liebherr: German precision engineering, excellent dealer support, and high resale value in France.
Model | Capacity (t) | Boom (m) | Price (β¬) | Highlights |
---|---|---|---|---|
ATF 70G-4 | 70 | 44 | 185 000 β 235 000 | Smart Chart β’ Stage V β’ Compact Mobility |
ATF 100G-5 | 100 | 52 | 245 000 β 315 000 | Mercedes-Benz Engine β’ Asym. Outriggers |
ATF 130G-5 | 130 | 60 | 285 000 β 345 000 | High-lift capacity β’ Smart Monitor |
Why Tadano: best for high-load construction and bridge assembly projects.
Model | Capacity (t) | Boom (m) | Price (β¬) | Highlights |
---|---|---|---|---|
QY50 | 50 | 42 | 155 000 β 185 000 | Cummins Stage V β’ CE Certified |
QY70 | 70 | 50 | 185 000 β 235 000 | Auto-Level β’ Low Fuel Use |
QY100 | 100 | 60 | 225 000 β 275 000 | All-Terrain β’ Hydraulic Stability |
Why XCMG: affordable EU-compliant option with quick parts delivery.
1οΈβ£ Emission level (Stage V adds β +10 %)
2οΈβ£ Boom length & capacity
3οΈβ£ Brand origin (EU vs Asia manufacture)
4οΈβ£ Inspection level (A-grade adds β +β¬8 000)
5οΈβ£ Warranty & CE documentation
Bank | Plan | Term | Rate | Deposit |
---|---|---|---|---|
BNP Paribas Leasing | Operating Lease | 24 β 60 mo | β 5.2 % | 15 % |
CrΓ©dit Agricole | Hire Purchase | 36 β 72 mo | 5.4 β 6.0 % | 10 β 20 % |
SociΓ©tΓ© GΓ©nΓ©rale Equip | Equipment Loan | 36 β 60 mo | β 6 % | 15 % |
β
Machinery Directive 2006/42/EC
β
Stage V Regulation 2016/1628
β
EN 13000 Crane Safety Standard
β
ISO 9001 Quality Management
π Authority Links:
Model | Fuel (L/h) | Hours / yr | Fuel β¬ @ 1.80 | Service β¬ | Total β¬/yr |
---|---|---|---|---|---|
Liebherr LTM 1070 | 25 | 1 200 | 54 000 | 12 500 | 66 500 |
Tadano ATF 100 | 28 | 1 200 | 60 480 | 12 900 | 73 380 |
XCMG QY70 | 22 | 1 200 | 47 520 | 11 800 | 59 320 |
β
Liebherr LTM 1070 β top choice for construction and wind installations.
β
Tadano ATF 100G-5 β preferred for heavy civil projects.
β
XCMG QY70 β value leader for medium-duty fleets.
Q1: Average price of a Liebherr LTM 1070 in France 2025?
β
β¬ 185 000 β β¬ 245 000 new; β β¬ 135 000 used.
Q2: Are machines Stage V and CE approved?
β
Yes β mandatory for EU operations.
Q3: Do you offer finance through French banks?
β
Yes β BNP Paribas & CrΓ©dit Agricole.
Q4: Delivery time to Paris or Lyon?
π 5 β 9 business days.
Q5: Do you include load test certificates?
β
Yes β full inspection + load certificate included.
crane price france 2025, liebherr ltm france, tadano atf france, xcmg qy70 france, mobile crane france, tower crane france, stage v crane france, ce certified crane france, construction machinery france, heavy equipment france 2025